Warrington Times Square
Commencing in August 2019 until completion in March 2020 this project consisted of over 3,500m2 of ceramic wall and floor tiles and almost 2,500m2 of terrazzo floor tiles including a terrazzo staircase and terrazzo upstands.
The works were split between the new council office building and the new market Hall. In the council office building, wall and floor tiles were fixed over five floors consisting of entrance lobby, ground floor seating areas as well as toilet and shower blocks. The terrazzo floor, staircase and upstands were fixed in the market hall to the ground floor and the mezzanine level. Ceramic floor and wall tiles were fixed to the new market stall units and also to toilet blocks over three levels as well as two ceramic staircases which service the three levels. The hard work and perseverance of our operatives ensured the works were completed on time and to a high standard.