Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/andrews-tiles.co.uk/httpdocs/wp-includes/functions.php on line 6121
Victoria Station, London - Andrews Tiles
Skip to content

Andrews pre-cast units were installed at London’s busiest toilets as part of a major redesign and refurbishment of the facilities at Victoria Station. The manufacture of the bespoke sink troughs involved the design of complex moulding and a lot of hand finishing work by our skilled craftsmen. Andrews also supplied the pre-cast coved skirting which was oversized to add the contrasting grey border around the lighter tiled floor areas.

Your browser is out of date!

Update your browser to view this website correctly. Update my browser now

×