The Lowry Centre
This contract involved the laying of approximately 1400m² of insitu terrazzo flooring together with 400mm high precast terrazzo cove skirtings including specialist angled skirting. We were also involved in the manufacture and fixing of a precast terrazzo staircase and precast terrazzo cladding and cappings.
These works required the expertise and experience of our employees in laying the insitu terrazzo flooring as well as specialist skills in fixing the cladding and staircase. The design of the staircase was also carried out in-house.