In collaboration with Open Contracts, 40mm thick precast terrazzo cladding panels were designed and manufactured for the back wall of a bank of toilets to a new office refurbishment in London, works were spread across 7 floors with 6 toilets per floor.
Panels were made to drawings and site dimensions provided at our manufacturing site in Leeds then Andrews installation team installed the panels including minor site cutting and fitting to overcome any slight discrepancies encountered.
An impressive end result that all the team were delighted with.