Andrews pre-cast units were installed at London’s busiest toilets as part of a major redesign and refurbishment of the facilities at Victoria Station. The manufacture of the bespoke sink troughs involved the design of complex moulding and a lot of hand finishing work by our skilled craftsmen. Andrews also supplied the pre-cast coved skirting which was oversized to add the contrasting grey border around the lighter tiled floor areas.